CAPACITY AND EQUIPMENT
Production of up to 200 tons of castings per month.
Production of up to 200 tons of castings per month.
Hunter 20” X 24” automatic molding machine.
B & P 16” x 20” automatic molding machine.
Automatic green sand system.
Two coreless induction melting furnaces Inductotherm (1 ton. and 1.5 ton.)..
Spectrometer Spectrolab.
Universal Testing Machine Shimadzu.
Thermal analysis and temperature control.
Brinell Hardness Tester
Shell: Shalco U180, B&P SF-6CA, Dependable 200.
Nobake: Palmer continuos mixer.
Radiant tube heat treating furnace, equipped with automatic cycle controller.